Primavera P6 planner for energy and industry

Experienced planners to build and maintain your project schedules in Primavera P6 or MS Project, in Île-de-France or on site.

The role

A reliable schedule, from first milestone to commissioning

The planner turns the project into activities, logic links and resources. The baseline schedule serves as a contractual reference, a benchmark for measuring progress and a forecasting tool for management. A poorly built schedule distorts every decision based on it.

Planning is PowerPlan’s original business. Our planners master Primavera P6 and Microsoft Project, multi-level schedules (from master schedule to site schedule) and the scheduling requirements of EPC and EPCI contracts.

Typical tasks

01
Building the baseline schedule and the work breakdown structure (WBS)
02
Periodic updates and critical path analysis
03
Progress curves (S-curves) and completion forecasts
04
Integrating contractors’ and subcontractors’ schedules
05
Scenario analysis and recovery plans
06
Preparing schedule evidence for claims
Typical profile
Need this profile?

Tell us about the context, duration and location of the assignment: we will get back to you quickly.

In practice

When to call on a planner?

01

Bid phase

Build a credible schedule for a tender response or a project review.

02

Execution

Keep the schedule up to date, flag slippage and prepare recovery plans.

03

Delay incurred

Reconstruct the sequence of events and measure their effect on the completion date.

How we work

Seconded or on deliverables, in Île-de-France

Our planners work from your offices in the Paris region or remotely, and visit sites for progress reviews with contractors.

Time and materials

Seconded experts

A PowerPlan expert is seconded to your organisation and joins your teams, for a short or long assignment, on site or at head office.

Fixed deliverables

Deliverable-based assignments

We commit to an outcome defined together: baseline schedule, audit, delay analysis, document control procedure… with scope, timeframe and price agreed from the outset.

FAQ

Your questions

Primavera P6 or MS Project: which one to choose?

Primavera P6 is the standard for large multi-contractor projects and EPC contracts; MS Project suits smaller projects. Our planners work with both and adapt to the tool required by the contract.

What is a baseline schedule?

It is the approved version of the schedule, frozen at the start of the project. It is used to measure actual progress and, where needed, to justify delays and their causes.

Can you take over an existing schedule?

Yes. We often start with an audit of the existing schedule (logic, constraints, float) before taking it over and keeping it up to date.

Careers

Join our team

Do you work in this role and want to take part in major energy and industrial projects? Send us your application with your CV.

    Plan ahead with us

    A schedule to build, a project to turn around, a PMO team to strengthen: let’s talk about your project.