Primavera P6 planner for energy and industry
Experienced planners to build and maintain your project schedules in Primavera P6 or MS Project, in Île-de-France or on site.
A reliable schedule, from first milestone to commissioning
The planner turns the project into activities, logic links and resources. The baseline schedule serves as a contractual reference, a benchmark for measuring progress and a forecasting tool for management. A poorly built schedule distorts every decision based on it.
Planning is PowerPlan’s original business. Our planners master Primavera P6 and Microsoft Project, multi-level schedules (from master schedule to site schedule) and the scheduling requirements of EPC and EPCI contracts.
Typical tasks
- Experience scheduling major industrial projects
- Advanced command of Primavera P6 and MS Project
- Knowledge of the earned value method
- Understanding of contractual scheduling requirements
- Works in French and English
Tell us about the context, duration and location of the assignment: we will get back to you quickly.
When to call on a planner?
Bid phase
Build a credible schedule for a tender response or a project review.
Execution
Keep the schedule up to date, flag slippage and prepare recovery plans.
Delay incurred
Reconstruct the sequence of events and measure their effect on the completion date.
Seconded or on deliverables, in Île-de-France
Our planners work from your offices in the Paris region or remotely, and visit sites for progress reviews with contractors.
Seconded experts
A PowerPlan expert is seconded to your organisation and joins your teams, for a short or long assignment, on site or at head office.
Deliverable-based assignments
We commit to an outcome defined together: baseline schedule, audit, delay analysis, document control procedure… with scope, timeframe and price agreed from the outset.
Your questions
Primavera P6 or MS Project: which one to choose?
Primavera P6 is the standard for large multi-contractor projects and EPC contracts; MS Project suits smaller projects. Our planners work with both and adapt to the tool required by the contract.
What is a baseline schedule?
It is the approved version of the schedule, frozen at the start of the project. It is used to measure actual progress and, where needed, to justify delays and their causes.
Can you take over an existing schedule?
Yes. We often start with an audit of the existing schedule (logic, constraints, float) before taking it over and keeping it up to date.
Join our team
Do you work in this role and want to take part in major energy and industrial projects? Send us your application with your CV.
- Time-and-materials or deliverable-based assignments
- Permanent, fixed-term or freelance
- Paris, Île-de-France and abroad
Plan ahead with us
A schedule to build, a project to turn around, a PMO team to strengthen: let’s talk about your project.